Indigenous intelligence, cultural legitimacy and technology-enabled protection for Edo State's critical infrastructure, communities and heritage.
These figures reflect our operating position as at today. As the programme expands across Edo State, both the number of profiled assets and the breadth of service coverage will continue to grow.
Igodomigodo is positioned as an Edo-first security platform, not a generic contractor. The profile combines local legitimacy, infrastructure protection, riverine reach and command-room accountability.
Communities are more likely to share intelligence with people they know, trust and can hold accountable — that legitimacy is the differentiator equipment alone can't provide.
Oil pipelines, gas pipelines, flow stations, gas plants, refineries and storage facilities.
Boundary corridors, riverine access routes and areas exposed to sabotage risk.
Respect for Edo cultural institutions and community leadership structures.
Local intelligence networks, early warning and non-intimidating engagement.
Trusted local observers, traditional structures and early-warning channels identify anomalies before escalation.
Drones, sensors, GPS patrol trails and digital incident reports validate and timestamp field intelligence.
Command-desk triage, evidence capture and agency liaison support authorised response and a shared operating picture.
Prevention, protection and long-term capacity — structured beyond guard deployment.
Threat detection, community intelligence, pipeline corridor monitoring and territorial analysis.
Pipeline protection strategy, crisis planning, cultural risk assessment and engagement frameworks.
Drone surveillance, motion sensors, GPS patrol systems, CCTV and incident platforms.
Pipelines, gas plants, flow stations, refineries, storage, routes and boundary corridors.
Drones, sensors, patrol boats, GPS trackers, night vision, communications and PPE.
Pipeline surveillance, riverine navigation, intelligence gathering and emergency response.
Beginning with focused local government areas strategically selected for their oil, gas and associated economic assets — with a phased rollout to additional LGAs as the programme progresses.
Oil pipelines · Gas pipelines · Flow stations · Gas plants · Refineries · Storage facilities · Riverine access routes · Boundary corridors
Note: Final corridors and asset profiles for each LGA will be jointly selected with Government and asset owners. As the programme expands, additional local government areas across Edo State will be added to the engagement footprint.
"ISN is designed to complement — not replace — statutory security agencies, approved operators and existing security contractors. Enforcement remains with authorised institutions."Institutional alignment statement